نتایج جستجو برای: Family Setup Time

تعداد نتایج: 2279039  

Journal: :journal of optimization in industrial engineering 2014
behzad nikjo javad rezaeian

this paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. gaining an optimal s...

E Mehdizadeh R Tavakkoli-Moghaddam

In this paper, a genetic algorithm is presented for an identical parallel-machine scheduling problem with family setup time that minimizes the total weighted flow time ( ). No set-up is necessary between jobs belonging to the same family. A set-up must be scheduled when switching from the processing of family i jobs to those of another family j, i  j, the duration of this set-up being the sequ...

Journal: :journal of industrial engineering, international 2011
e mehdizadeh r tavakkoli-moghaddam

in this paper, a genetic algorithm is presented for an identical parallel-machine scheduling problem with family setup time that minimizes the total weighted flow time ( ). no set-up is necessary between jobs belonging to the same family. a set-up must be scheduled when switching from the processing of family i jobs to those of another family j, i  j, the duration of this set-up being the sequ...

This paper presents a novel, integer-linear programming (ILP) model for an identical parallel-machine scheduling problem with family setup times that minimizes the total weighted flow time (TWFT). Some researchers have addressed parallel-machine scheduling problems in the literature over the last three decades. However, the existing studies have been limited to the research of independent jobs,...

Nadia Bhuiyan Shahram Sharifi Stayaveer.S. Chauhan

This paper presents the idea of creating cells while reducing part-level sequence-dependent setup time in general cellular manufacturing systems (CMS). Setup time reduction in CMS has gained modest attention in the literature. This could be attributed to the fact that the fundamental problem in cell formation in CMS has been mainly related to material handling and machine utilization while setu...

This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...

Journal: :Expert Syst. Appl. 2012
Shu-Hsing Chung Ming-Hsien Yang Ching-Kuei Kao

For a single finite-capacity machine that can process several product types of jobs, uncertainties in job arrival time and product type can make the calculation of required setup time and the setting of output target very complicated. Setup activities may cause wastage in machine capacity and extend job lead time. In such circumstances, the family-based scheduling rule (FSR) can be used to redu...

Journal: :international journal of supply and operations management 2014
m vijayashree r uthayakumar

in this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. the cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. lead time is an important element in any inventory system. the proposed model is presents an integrated inventory model with controllable lead tim...

نمودار تعداد نتایج جستجو در هر سال

با کلیک روی نمودار نتایج را به سال انتشار فیلتر کنید